15 CSI Construction Divisions · 4-Stage Inspection Waterfall · Non-Dutch Bridge Desk

Rehab Scope of Work (SOW) & 4-Stage Construction Draw Schedule Builder

Direct Answer (Rehab Holdback & Draw Underwriting Rule): Institutional Fix & Flip and BRRRR bridge lenders fund up to 85%–90% of as-is purchase price plus 100% of verified rehab costs (capped at 70%–75% of After-Repair Value / ARV), disbursed across 4 inspection draw stages. Structuring on a Non-Dutch drawn-balance shelf (LD-SHELF-RTL-BRIDGE) charges interest only on disbursed funds rather than the full undrawn rehab reserve, saving borrowers thousands during construction. Arranged by Loan Daddy LLC (NMLS #2827624 · [email protected]).
15-Trade Rehab Holdback
$110,000
Total Cost: $430,000
Total Bridge Loan (LTC / ARV)
$382,000
88.8% LTC · 72.8% ARV LTV
Non-Dutch Interest Saved
+$3,086
Drawn-Balance vs. Dutch Full-Note
90-Day 75% ARV DSCR Takeout
$393,750
Net Payoff Cushion: $11,750
Draw 1: Demo, Framing & Structural
$20,500 (19%)
Draw 2: Roof, Windows & MEP Rough-In
$36,500 (33%)
Draw 3: Drywall, Kitchens, Baths & Floors
$41,500 (38%)
Draw 4: Exterior, Final Punchlist & CO
$11,500 (10%)

15-Trade CSI Division Scope of Work (SOW) & Draw Allocation Table

CSI DivisionConstruction Trade / Line ItemInspection Draw StageLine-Item Budget ($)% of Rehab
Div 02Demolition, Hauling & DumpstersDraw Stage #14.1%
Div 03Foundation, Concrete & StructuralDraw Stage #15.5%
Div 06Rough Framing & Subfloor CarpentryDraw Stage #16.8%
Div 07Roofing, Fascia & GuttersDraw Stage #28.6%
Div 22Plumbing Rough-In, Re-Pipe & Water HeaterDraw Stage #25.9%
Div 26Electrical 200A Panel & Re-WireDraw Stage #25.5%
Div 23HVAC Condenser, Ductwork & Mini-SplitsDraw Stage #27.3%
Div 09AInsulation, Drywall & Interior/Exterior PaintDraw Stage #38.2%
Div 09BLVP Flooring, Tile & BaseboardsDraw Stage #37.7%
Div 12AKitchen Shaker Cabinets, Quartz & AppliancesDraw Stage #313.2%
Div 12BBathrooms, Vanities, Tubs & Tile SurroundsDraw Stage #38.6%
Div 08Low-E Windows, Sliders & Entry DoorsDraw Stage #25.9%
Div 32Stucco/Siding, Driveway & LandscapingDraw Stage #44.5%
Div 01APermits, Architecture & Engineering PlansDraw Stage #12.3%
Div 01B10% Hard-Cost Contingency ReserveDraw Stage #45.9%
LD-SHELF-RTL-BRIDGE (Non-Dutch Drawn-Balance) + LD-SHELF-PRIME-104 (90-Day ARV Takeout)

Lock Non-Dutch Rehab Financing + Waived-Exit-Fee DSCR Takeout

Submit your 15-trade SOW to Loan Daddy LLC (NMLS #2827624 · (480) 485-1229) for 85%–90% purchase + 100% rehab holdback on a Non-Dutch drawn-balance shelf.

Submit SOW to Bridge & BRRRR Desk ([email protected]) →
Rehab Scope of Work (SOW) & 4-Stage Construction Draw Schedule Builder | FindLoanBrokers.com